Verizon Equipment

The Verizon equipment has arrived and been placed in the rack. Fiber splicing is also complete (as seen by the jumper on top of the fiber shelf completing the loop before the equipment can be inserted into the loop). The shelf is an Adtran OPTI-6100 MX. They’ll be back tomorrow to hook up the rectifier/inverter and battery bank.

DCP_2470 DCP_2471